Construction from SIP panels.

Building houses from SIP panels, this is a method of erecting outside the city at home from vary materials – blocks. The size of the block does not exceed, for example, the size of the OSB plate. Building from such material is built soon and as for the inexpensive. They are conceived by construction from such panels according to two key methods: the project situation for the construction of SIP panels, or suitable design of the system for panel development in one technique.

There are no restrictions in the most important alternative to the project, which makes it possible to create a project for panels with lower financial costs. Even the cost of material. Usually, adapting a project based on the use of alternative materials for SIP – panels, it is possible to cover with panels more than fifty percent of the walls. Since the project from the very beginning is developed for the use of SIP panels, then panels are closed within eighty percent of the wall surface.

High -quality SIP panels in St. Petersburg is not easy to buy. Nevertheless, since developing a project specifically under the SIP panels, which means that few difficulties are likely. In an effort to take into service the properties of the panels and save, it is quite possible to get a meticulous in the city at home to get similarity of a warm, high -quality building, but in appearance similar to the hut. As a result of this, it follows in advance to outline the backup architecture of construction. Not to mention the fact that, since the house is made “in favor of itself”, then architectural delights are needed.

If you combine SIP – panels with optimal elements and components, it is quite possible to get not only economical, but also many home and high -quality construction. As a frame, for example, glued beam is used in power. He will also set a joint type of construction. Superfluous to enter the excitement only by using SIP – panels is not worth. The construction of construction goes on the throat of periods and means. As a result of this, a pre -drawn up plan makes it possible to solve a number of active problems, as much as they will be a brown in a strom of plan and facilitate striking worries.